Project Overview

26-meter deep excavation with upper strut and two lower rows of anchors. Pipe props up to 33 meters with axial loads up to 600 tons.

Challenge

Managing high axial loads and limited anchor installation zones.

Our Solution

Engineered high-capacity strutting system with bearing ring and pipe prop system designed with 3D modeling and sequential loading tests.

Results Achieved

  • Stable excavation performance confirmed by monitoring
  • Efficient material optimization reduced steel usage by 20%

Technical Details

Depth
26 meters
Wall Type
Spaced piles with struts and anchors
Soil Conditions
Dense sand with clayey interlayers
Groundwater Level
6 meters
Pipe Prop Length
33 meters
Max Axial Load
600 tons