
No images available at the moment
Check back later
Temporary shoring system design and installation for BEAC (Bank of Central African States) construction project, ensuring safe excavation and structural stability.
Critical banking infrastructure requiring highest safety standards with minimal disruption to surrounding urban environment and existing structures.
Implemented advanced temporary shoring system with comprehensive monitoring and safety protocols, designed to international banking facility standards.
Our team brings the same level of expertise and innovation to every project. Let's discuss how we can help with your geotechnical challenges.