
27-meter deep excavation with spaced piles supported by anchors and struts in a dense residential zone.
Urban constraints and adjacent historic masonry structures requiring controlled lateral movement.
Hybrid system of spaced piles with prestressed anchors and top-level struts; real-time monitoring for deflection control.
Our team brings the same level of expertise and innovation to every project. Let's discuss how we can help with your geotechnical challenges.